Key takeaways
- NFPA 70B became an enforceable standard in 2023, and the 2026 edition is current: equipment owners need a documented electrical maintenance program with intervals based on equipment condition.
- NFPA 70E requires arc flash risk assessments to be reviewed at least every five years (and after major changes) and qualified workers to be retrained at least every three years.
- Salt air, humidity and condensation inside enclosures are the main enemies of coastal electrical equipment. Enclosure selection, sealing and heating matter as much as inspection.
- Voltage unbalance on three-phase systems overheats motors; even small amounts call for attention.
- After a flood or surge, never re-energize wet equipment without evaluation and insulation-resistance testing.
Why coastal facilities wear out faster
A warehouse in Bay County faces conditions that an inland plant doesn’t: salt-laden air that corrodes terminations and bus, high humidity that condenses inside enclosures every night, summer heat that pushes equipment toward its temperature limits, frequent lightning, and the occasional hurricane. Hurricane Michael’s storm surge in 2018 reached an estimated 9 to 14 feet above ground between Tyndall Air Force Base and Port St. Joe. Equipment that would last decades inland can fail far sooner here without a maintenance plan built for the coast.
NFPA 70B: from “recommended” to “required”
For 50 years NFPA 70B was a recommended practice. In January 2023 it became the Standard for Electrical Equipment Maintenance, and its language changed from “should” to “shall.” The 2026 edition is now current. The core requirements:
- A written Electrical Maintenance Program (EMP), with named people responsible for it.
- Condition-based intervals. Each piece of equipment is assessed — physical condition, criticality and operating environment — and that assessment sets how often it is inspected and tested. Equipment in poor condition or a harsh environment gets shorter intervals.
- Infrared thermography of connections and terminations under load, along with other fundamental tests such as insulation resistance and torque checks.
- Documentation of inspections, results and corrective actions.
The 2026 edition adds a dedicated chapter on transfer switch equipment, gives more weight to continuous condition monitoring, and addresses cybersecurity for the operational technology that controls electrical systems. Whether 70B is enforceable at your site depends on what your authority having jurisdiction, insurer or contracts reference, so confirm which edition applies. Even where it isn’t formally adopted, it is the yardstick insurers and investigators use.
NFPA 70E and arc flash
NFPA 70E, the Standard for Electrical Safety in the Workplace, is how most employers meet OSHA’s electrical safety obligations. Key recurring requirements:
- An arc flash risk assessment with equipment labels, reviewed at intervals not exceeding five years and updated after major modifications or renovations.
- Retraining of qualified workers at intervals not exceeding three years, and sooner when duties change or procedures aren’t followed.
- A preference for de-energized work, with energized work allowed only when justified and permitted.
Maintenance and safety are linked. A breaker that hasn’t been exercised or tested may clear a fault slowly, and a slower clearing time means much more incident energy. The arc flash study’s numbers assume the equipment has been properly installed and maintained. A good 70B program keeps the 70E labels honest.
Corrosion and moisture control
- Choose the right enclosure. NEMA Type 4X enclosures (stainless steel or non-metallic) are built for corrosive, washdown and outdoor coastal locations.
- Keep moisture out. Seal conduit entries, use drains and breathers where needed, and keep doors and gaskets in good repair.
- Keep enclosures above the dew point. Thermostatically controlled space heaters in outdoor switchgear and motor control equipment prevent nightly condensation.
- Protect connections. Use anti-oxidant compound where the manufacturer requires it on aluminum terminations, follow torque specifications, and re-check connections that show heat on an infrared scan.
- Replace, don’t clean, badly corroded devices. Corroded breakers and contactors may not operate as designed during a fault.
Three-phase power quality
Most industrial motors run on three-phase power, and they are sensitive to imbalance between phases. Small voltage unbalances cause disproportionately large current unbalances and heating, and NEMA’s motor guidance calls for derating motors once voltage unbalance exceeds 1%. Common causes include unevenly distributed single-phase loads, a failing utility transformer, and high-resistance connections. Phase-loss and phase-unbalance relays protect expensive motors from single-phasing. Variable frequency drives add harmonics that can overheat neutrals and transformers. Periodic power quality monitoring catches all of these before they turn into failures.
After a storm: a safe restart plan
- Don’t re-energize equipment that got wet until it has been inspected. Flood water and salt residue can create tracking paths and ground faults.
- Follow manufacturer and NEMA guidance on which water-damaged equipment must be replaced and which can be reconditioned by qualified people.
- Test insulation resistance on motors, cables and transformers that were exposed, and compare to baseline values.
- Bring loads back in stages and watch for abnormal current, noise or heat.
- Run an infrared scan under load once the plant is back up, and document everything for your insurer.
Energy audits that pay for themselves
Many facilities can cut operating costs with an energy audit. ASHRAE defines three levels: a Level 1 walk-through that finds low-cost and no-cost savings, a Level 2 energy survey and analysis that breaks down where energy goes and estimates savings for each measure, and a Level 3 detailed analysis of capital-intensive projects. Lighting upgrades, motor and drive improvements, compressed air leaks and power factor correction are common findings.
Industrial maintenance checklist
- Confirm you have a written electrical maintenance program and an owner for it.
- Assess equipment condition and set inspection intervals; shorten them for coastal and outdoor gear.
- Schedule an annual infrared scan under load; act on and document findings.
- Check the date of your arc flash risk assessment and labels (five-year maximum).
- Check qualified-worker training records (three-year maximum).
- Inspect enclosure seals, heaters and corrosion on outdoor equipment.
- Monitor voltage unbalance and protect critical motors from single-phasing.
- Write a post-storm restart procedure before hurricane season.
Frequently asked questions
Is NFPA 70B mandatory?
NFPA 70B has been a standard, with mandatory “shall” language, since its 2023 edition, and the 2026 edition is current. Whether it is enforceable at a particular facility depends on adoption by the authority having jurisdiction, insurer requirements and contracts. Even where it is not formally adopted, it is widely used as the benchmark for a reasonable electrical maintenance program.
How often should an arc flash study be updated?
NFPA 70E requires the arc flash risk assessment to be reviewed at intervals not exceeding five years, and updated whenever a major modification or renovation changes the electrical system — for example, a new service, a utility transformer change or new large equipment.
How often do workers need NFPA 70E training?
Qualified workers must be retrained in electrical safety-related work practices at intervals not exceeding three years, and sooner if their duties change, new technology is introduced, or supervision shows they are not following required practices.
Can electrical maintenance be done without shutting the plant down?
Some of it. Infrared scans and power quality monitoring are done under normal load. Cleaning, torque checks, insulation-resistance testing and breaker testing generally require the equipment to be de-energized, so plan them into scheduled shutdowns.
Sources and further reading
- Eaton — NFPA 70B 2026 overview (opens in a new tab)
- ESFI — Requirements in NFPA 70B (opens in a new tab)
- EC&M — Two NFPA standards for workplace safety (70E and 70B) (opens in a new tab)
- NEMA — Evaluating Water-Damaged Electrical Equipment (opens in a new tab)
- National Weather Service — Hurricane Michael (2018) (opens in a new tab)
Last reviewed November 2026.