Whittaker Electric

Call (850) 763-6296

Whittaker Electric

About Us

Whittaker Electric, Inc. is locally owned & operated by the Whittaker family as the electrical professionals for residential, commercial, and industrial electrical services in the Panama City, Florida area.

Contact Info

Follow Us

License #EC13007801

Residential9 min read

Storm-Ready Home Electrical Guide for Bay County Homeowners

Generators and transfer switches, whole-home surge protection, salt air, what to do after a flood, and what Florida’s new building code means for your next project.

By the licensed electricians at Whittaker Electric · Florida license #EC13007801

Key takeaways

  • Most of Bay County gets power from FPL (the former Gulf Power territory); parts of the county are served by Gulf Coast Electric Cooperative. Report outages to your utility — everything on your side of the meter is yours to repair.
  • The safest way to run a portable generator is through a permitted inlet plus an interlock kit or transfer switch. Never backfeed through a dryer or wall outlet, and keep the generator at least 20 feet from doors, windows and vents.
  • A whole-home surge protector at the panel, plus point-of-use strips for electronics, is cheap insurance in one of the most lightning-prone states in the country.
  • If water reached outlets, the panel or appliances, don’t turn the power back on until a licensed electrician has evaluated it.
  • Florida’s 9th Edition (2026) Building Code, which brings in the 2023 National Electrical Code, takes effect December 31, 2026. The code in effect on the day the permit application is filed is the one that applies.

Know who powers your home — and where your responsibility starts

Most homes and businesses in Bay County buy their power from Florida Power & Light (FPL), which took over the former Gulf Power service area. Parts of the county are served by Gulf Coast Electric Cooperative, a member-owned co-op with a local office in Southport. Your power bill tells you which one you have. Save the outage-reporting number and app for the right utility before storm season.

The utility owns the lines up to your meter. The weatherhead, service mast, meter base and everything inside the house belong to you. After a storm, that line matters: if the mast is pulled off the wall or the meter base is damaged, the utility usually can’t reconnect you until a licensed electrician repairs it, and the repair may need a permit and inspection. Knowing that ahead of time saves days of waiting.

Backup power: choosing the right setup

Hurricane Michael showed what an extended outage looks like here: about a week after the October 2018 landfall, more than half of Bay County’s customers were still without power. Your backup plan should match how long you can do without air conditioning, refrigeration, a well pump or medical equipment.

OptionHow it worksGood fit for
Portable generator + extension cordsAppliances plug straight into the generator.A fridge, a fan and phone charging for a short outage.
Portable generator + inlet + interlock kit or manual transfer switchAn outdoor inlet feeds your panel; an interlock or transfer switch makes it impossible to connect to the utility at the same time.Running chosen hardwired circuits (well pump, lights, a window unit or mini-split) without cords through the house.
Standby generator + automatic transfer switchA permanently installed natural gas or propane generator starts and switches over by itself.Whole-home or large partial backup, longer outages, households that depend on power for health or work.

Never backfeed. Plugging a generator into a dryer or wall outlet with a double-ended “suicide cord” can energize the utility lines outside your home and injure line workers, and it can start a fire inside your walls. An interlock kit or transfer switch is the legal, inspected way to do it.

Mind the exhaust. The CDC says to keep a running generator outside and at least 20 feet from any doors, windows or vents, and never in a garage, even with the door open. Put battery-powered CO alarms near bedrooms.

Permits. Permanently installed generators, inlets and transfer equipment need an electrical permit. Unincorporated Bay County permits go through Bay County Builders Services, which publishes a generator permit packet and checklist. Most cities, including Panama City, Lynn Haven and Panama City Beach, run their own building departments. A licensed contractor pulls the permit for you.

Size it to your real loads. Air conditioning is usually the biggest load in a Florida home. Before buying a generator, list what you truly need running and have an electrician do a load calculation. A generator that is too small trips constantly; one that is much too large wastes fuel.

Whole-home surge protection

Florida sees more lightning than almost anywhere in the country, and surges also happen when utility crews re-energize lines after an outage. A surge protective device (SPD) installed at your main panel takes the big hit; plug-in surge strips at TVs, computers and networking gear handle what’s left. The National Electrical Code now requires an SPD whenever a dwelling’s service equipment is replaced or upgraded, so if you’re planning a panel swap, it’s already part of the job.

SPDs wear out as they absorb surges. Most have a status light — check it at the start of every hurricane season and after a nearby strike.

Salt air, humidity and your electrical system

Coastal air is hard on metal. Have an electrician look at your system if you notice any of these:

  • Rust on the outdoor panel, meter base or disconnect cover, or a cover that won’t latch.
  • White or green crust on wire terminals or breakers (visible only with the cover off — leave that to a professional).
  • Breakers that feel warm, buzz, or trip for no clear reason.
  • Flickering lights when the AC or another large appliance starts.
  • Cracked or missing outdoor outlet covers. Outdoor receptacles in wet locations should be weather-resistant (WR) and have “in-use” covers that stay closed while something is plugged in.

Older panels such as Federal Pacific and Zinsco deserve a closer look. Florida insurers often ask for a four-point inspection (roof, electrical, plumbing and HVAC) on older homes, and outdated or damaged panels can affect coverage.

After a storm or flood: what not to do

  • Stay at least 30 feet away from downed lines and anything touching them, and assume every line is energized. Report it to your utility.
  • If water reached outlets, the panel, the HVAC air handler or appliances, leave the main breaker off and have the equipment evaluated before the power comes back on. Electrical equipment that has been under water should never be assumed safe just because it looks dry.
  • Industry guidance from NEMA (the National Electrical Manufacturers Association) says many submerged components — breakers, GFCI and AFCI devices, receptacles, switches and some cable — generally need replacement rather than drying out. Salt water is especially damaging because its residue is both corrosive and conductive.
  • Use only licensed contractors. Unlicensed “storm chasers” are a known problem after every major hurricane. You can check any Florida contractor’s license on the Florida DBPR website.

Want a one-page version for your fridge? Download our Coastal Readiness Guide (PDF).

Florida’s code change on December 31, 2026

Florida updates its building codes every three years. The 9th Edition (2026) Florida Building Code takes effect on December 31, 2026, and with it the state moves from the 2020 to the 2023 National Electrical Code. Under Florida law, the code edition in effect on the date a permit application is filed governs that work, so projects applied for on or before December 30, 2026 are generally reviewed under the current 8th Edition.

Changes in the 2023 NEC that homeowners may notice on new work include:

  • More GFCI protection — for example, all 125- to 250-volt receptacles in kitchens, not just the ones serving countertops, plus certain appliances such as ranges, wall ovens, dryers and microwaves.
  • Outdoor emergency disconnects so first responders can shut off power to one- and two-family homes from outside, with the rule extended to more types of installations.
  • Surge protection requirements carried forward and expanded.

Florida can amend parts of the NEC, and GFCI protection for outdoor HVAC equipment in particular has been debated during this code cycle. Your electrician and your permit office have the final word on what applies to a specific job — ask before you buy equipment.

Before June 1: a homeowner’s electrical checklist

  • Confirm which utility serves you and save its outage number and app.
  • Test GFCI outlets in kitchens, bathrooms, garage and outdoors using the TEST and RESET buttons.
  • Check the status light on your whole-home surge protector.
  • Start and load-test your generator; change the oil and check fuel or propane supply.
  • Label your panel so anyone in the house can find the main breaker.
  • Replace cracked outdoor covers and look for rust on the panel, meter base and AC disconnect.
  • Make sure CO alarms near bedrooms have fresh batteries.
  • Write down a licensed electrician’s number before you need it: Whittaker Electric, (850) 763-6296.

Frequently asked questions

Do I need a permit to install a generator in Bay County, Florida?

Yes, for any permanently installed generator, generator inlet, interlock kit or transfer switch. Unincorporated Bay County issues electrical permits through Bay County Builders Services; most cities, including Panama City, Lynn Haven and Panama City Beach, have their own building departments. A licensed electrical contractor normally pulls the permit and schedules inspections. A portable generator that only powers appliances through extension cords does not need an electrical permit.

Is a generator interlock kit safe and legal?

Yes, when it is listed for your specific panel and installed under a permit. An interlock physically prevents the main breaker and the generator breaker from being on at the same time, so your generator can never backfeed the utility lines. It is a lower-cost alternative to a manual transfer switch.

How long does a whole-home surge protector last?

It depends on how many surges it absorbs. Many units have a status light that shows when protection is lost. Check it every year before hurricane season and after any nearby lightning strike, and replace the device when the light indicates it has been used up.

Should I turn off my main breaker before a hurricane?

If you are evacuating, or flooding is expected and you can reach the panel while standing somewhere dry, switching off the main breaker can protect appliances and reduce fire risk. Never touch the panel or any electrical equipment while standing in water. If water reached the panel or outlets, leave the power off until a licensed electrician has checked the system.

Written by the Whittaker Electric team. Whittaker Electric, Inc. is a family-owned electrical contractor in Panama City, Florida (license #EC13007801), serving Bay County for over 30 years. This article is general information, not a substitute for an on-site evaluation; codes and requirements can change, so confirm details for your property with a licensed electrician and your local building department.

More From Our Blog

Visit the Blog

Ready to Talk to a Licensed Electrician?

Whittaker Electric has served Panama City, Lynn Haven, Panama City Beach, Callaway and the rest of Bay County for over 30 years. Request a free quote or call our help desk today.

Cookie settings

Choose which cookies Whittaker Electric can use. Essential cookies keep the site working and can’t be turned off. Read our cookie details.

Essential (always on)

Remember your cookie choice and keep the site secure. No tracking.

Analytics

Google Analytics counts visits and shows which pages help people, so we can improve the site.

Marketing & advertising

Google Ads cookies measure which ads lead to calls and quote requests and may personalize ads.