Key takeaways
- Decide now which loads must stay on in an outage — refrigeration, point-of-sale and network, lighting, life safety — and whether that calls for a standby generator or a generator connection cabinet for a rental unit.
- A generator keeps the lights on; it doesn’t stop surges. Layer surge protection at the service, at panels that feed sensitive equipment, and at the point of use.
- Battery-powered emergency and exit lights need a 30-second test every month and a 90-minute test every year, with written records.
- An annual infrared scan of switchgear, panels and disconnects finds loose, overheating connections before they fail.
- Florida adopts the 2023 NEC on December 31, 2026. Build-outs and remodels are reviewed under the code in effect when the permit application is filed.
Plan for the outage before hurricane season
For a restaurant, medical office or retail store, a long outage means spoiled inventory, lost sales and staff sent home. Start by listing the loads that must keep running and how long they need to run:
- Refrigeration and freezers — usually the most expensive thing to lose.
- Point-of-sale, phones, network and security systems — often small loads that can run from a UPS plus a modest generator.
- Lighting for safe occupancy and security.
- Pumps — lift stations, sump pumps or wells.
- HVAC — the largest load, and the one that drives generator size if you need it.
Then choose the approach:
| Approach | What it is | Trade-offs |
|---|---|---|
| Permanent standby generator with automatic transfer switch | A generator sized to your critical loads that starts and transfers on its own. | Highest cost; best for businesses that cannot close. Needs fuel planning and routine exercise and maintenance. |
| Generator connection cabinet (docking station) or manual transfer switch | A permanently wired connection point so a rental or trailer generator can be plugged in quickly and safely. | Lower upfront cost. Rental generators are in short supply after a major storm, so reserve one in advance. |
| UPS for IT and point-of-sale only | Battery backup for small electronic loads. | Rides through short outages and lets systems shut down cleanly; not a solution for long outages. |
Transfer equipment needs maintenance too. The 2026 edition of NFPA 70B, the national standard for electrical equipment maintenance, added a chapter dedicated to transfer switches. Exercise your generator on the manufacturer’s schedule and test the transfer under load before June.
Layered surge protection
Lightning gets the attention, but many damaging surges start inside the building when compressors, motors and elevators switch on and off. A layered plan works best:
- A surge protective device at the main service.
- Additional devices at panels that feed sensitive equipment — point-of-sale, servers, controls, medical or kitchen electronics.
- Point-of-use protection at the equipment itself.
Correctly installed, the same protection covers power coming from your generator. Check status indicators after storms; a protector that has absorbed a large surge may need replacement.
Parking lot and exterior lighting in salt air
Exterior lighting protects customers and staff, and dark lots invite trouble. On the coast, specify LED fixtures listed for wet locations with corrosion-resistant housings and stainless hardware. After every major storm, check pole bases, handholes and anchor bolts for damage and corrosion, and replace failed photocells and timers so the lot isn’t lit all day or dark all night. Converting older fixtures to LED usually cuts energy use and maintenance trips with a bucket truck.
Emergency and exit lighting: test and document
Florida’s Fire Prevention Code adopts NFPA 101, the Life Safety Code. For battery-powered emergency lights and exit signs, that means a functional test of at least 30 seconds every month and a full 90-minute test every year, with written records kept for the fire inspector. Units that fail the 90-minute test usually need new batteries or replacement. Your electrician can replace failed units and check that the lights cover your exit paths after a remodel.
Infrared scans and preventive maintenance
Loose or corroded connections heat up long before they fail. An infrared (thermal) scan of switchgear, panels, disconnects and transfer equipment under normal load finds those hot spots without shutting the business down. Since 2023, NFPA 70B has been a standard rather than a recommended practice: it calls for a documented electrical maintenance program, with inspection intervals set by each piece of equipment’s condition and criticality. Insurers increasingly ask to see that documentation. Coastal heat and salt air are good reasons to scan at least once a year.
Build-outs, remodels and the December 31, 2026 code change
The 9th Edition (2026) Florida Building Code takes effect on December 31, 2026, and Florida moves to the 2023 National Electrical Code with it. Florida law ties a project to the code in effect on the date its permit application is filed, so applications filed on or before December 30, 2026 are generally reviewed under the current 8th Edition.
Changes in the 2023 NEC that often matter in commercial spaces include expanded GFCI protection in non-dwelling kitchens and new GFCI requirements in areas such as buffet serving areas. If you have a restaurant build-out, a kitchen remodel or a tenant improvement on the calendar, talk to your electrician and designer now about which code edition your plans will be reviewed under.
All commercial electrical work needs a permit pulled by a licensed contractor. Load calculations come first, especially when you’re adding kitchen equipment, HVAC or EV chargers to an existing service.
EV charging for employees, customers and fleets
Start with a load calculation to see what your existing service can support. Level 2 chargers work well for employee parking and overnight fleet charging; DC fast chargers need far more capacity and usually involve the utility. Load-management systems can share available capacity across several chargers and sometimes avoid a costly service upgrade. EV charging equipment falls under NEC Article 625, and chargers need dedicated circuits and proper disconnects.
Commercial electrical checklist
- List critical loads and decide on a standby generator, a connection cabinet or a UPS strategy.
- Reserve a rental generator before hurricane season if you don’t own one.
- Exercise and load-test generators and transfer switches.
- Check surge protector status indicators at the service and panels.
- Run and log monthly emergency-light tests; schedule the annual 90-minute test.
- Schedule an infrared scan of switchgear, panels and disconnects.
- Walk the parking lot at night; note dark poles and damaged fixtures.
- Confirm which code edition your next build-out or remodel will be permitted under.
Frequently asked questions
How often do emergency lights and exit signs need to be tested in Florida?
Florida’s Fire Prevention Code adopts NFPA 101, which calls for battery-powered emergency lighting to be tested for at least 30 seconds every month and for a full 90 minutes once a year, with written records of each test kept for inspection.
Can a rental generator be connected to our building?
Yes, safely, if the building has a permanently installed generator connection cabinet (docking station) or a transfer switch. These let a rental or trailer generator plug in without temporary wiring and without any chance of backfeeding the utility. Installing one requires an electrical permit.
Does Florida’s new building code affect our planned remodel?
It depends on when the permit application is filed. The 9th Edition (2026) Florida Building Code, which adopts the 2023 National Electrical Code, takes effect on December 31, 2026. Applications filed on or before December 30, 2026 are generally reviewed under the current 8th Edition; applications filed later must meet the new edition.
How often should a commercial building have an infrared electrical scan?
NFPA 70B sets inspection intervals based on each piece of equipment’s condition and how critical it is. Many facilities scan switchgear, panels and disconnects at least once a year; equipment in poor condition or harsh coastal environments may need more frequent checks. Your insurer may also have requirements.
Sources and further reading
- Florida Building Commission — Florida Building Code (9th Edition, effective Dec. 31, 2026) (opens in a new tab)
- Greenberg Traurig — New Florida Building Code edition takes effect Dec. 31, 2026 (opens in a new tab)
- Miami-Dade County — FBC 9th Edition code change notice (PDF) (opens in a new tab)
- Eaton — NFPA 70B 2026 overview (opens in a new tab)
- IAEI Magazine — Major changes in the 2023 NEC (opens in a new tab)
- Bay County Builders Services — Permits (opens in a new tab)
Last reviewed November 2026.

